The proposed project for “CTF Office Extension” provides the construction of a new office building near the existing building at Central Treatment Facility (CTF) of the Company Bankers Petroleum Albania Ltd, constructed with Construction Permit Approved by the Decision of NCT no.4, Dated 04.07.2013. In the proposed area to be constructed there are currently three […]
Read moreGR Albania as a subcontractor of “Albayrak Turizm Seyhat Ins Ticaret As” and in cooperation with the Administration of Construction of Social Housing (TOKI) has realized the project for the Object “Construction of Five Hundred and Twenty Two Apartments as well as Social Facilities” located in the Administrative Unit Laç, Kurbin Municipality. The location of […]
Read moreGR Albania is currently working on the Implementation Project for the Lot 7 of the new Kardhiq – Delvinë Road, a 33km road that is currently being constructed in the south of Albania. This road segment includes the Skarfica Tunnel and is located between Lot 4 and Lot 6 of the road. This segment has […]
Read more“Spiecapag Transadriatica” has been contracted by Trans Adriatic Pipeline AG (TAP) to carry out the civil works for the construction of the Trans Adriatic Pipeline land section in Albania and Greece. Since December 2017, GR Albania has been contracted Spiecapag Transadriatica to perform the environmental monitoring of the project during the construction phase. The environmental […]
Read moreSOWI Kosovo LLC plans to develop and operate the Wind Farm Selac I, II and III in Kosovo. The Project is located near the village of Bajgora in the municipality of Mitrovica, in Northern Kosovo. The wind farm project consists of 27 WTGs type GE 3.8-137 with a capacity of 3.83 MW with a hub […]
Read moreJanjar & Mursi Irrigation scheme lies in the Municipalities of Konispol & Finiq covering an agricultural area of 5500ha. The municipalities are located in the southern edges of the country. The Janjar & Mursi irrigation scheme is composed of: i) Janjar Reservoir including the dam and 22km of main irrigation canal of Janjar; ii) Mursi […]
Read moreThe Arbri Road is being constructed with the goal to connect the capital city of Tirana with Dibra Region. This road starts in Tirana and will end near Peshkopia city. The Arbri Road Construction work is focused on building the roadway, opening the tunnels, and building large and medium bridges as well. Currently on this […]
Read moreThe proposed development of the winter sport facilities in Nikolica Village requests as well the creation of tourist residencies and accommodation. The company Nikolica Ski Resort is proposing to build a 5 star alpine hotel with all this necessary facilities. For this purpose, GR Albania undertook a feasibility study consisting of detailed and necessary analysis and […]
Read moreThis urban study consists in the development of the coastal tourism in Zvërnec, Vlora District. The latest developments, regarding the construction of the third national airport of Albania in Akërni, have brought again in focus the Zvërnec area. This urban study for Zvërnec, combines the summer tourism with the requested touristic residences and accommodation, the […]
Read moreThe Supervision Consultant is charged to supervise the rehabilitation construction works and to follow the defects liability period of one year. The 11 irrigation dams show the following particularities: Murriz Dam (H 17 m, L 3,570 m, storage 66×106 m3, irr. area 420 km2) Kurjan, Dam (H 17 m, L 540 m, storage 31.5 x106 […]
Read moreMuch of the Irrigation and Drainage infrastructure in Albania is degraded due to years of neglect. The main weaknesses in I&D sector governance include: (i) poor I&D service delivery; (ii) poor condition of I&D infrastructure, with many canals and pumping stations no longer operational and many dams exhibiting safety concerns; and (iii) weak capacities of […]
Read moreThis project consists of: Implementation Project “Construction of the Hydropower Plant Cascade on Grabova River” Grabova 1 Hydropower Plant (14.9 MW) and Implementation Project “Construction of the Hydropower Plant Cascade on Grabova River” Grabova 2 Hydropower Plant (10.8 MW). The Grabova stream to Devolli River in the 349.3m quota has a catchment area of F = […]
Read moreGR Albania has completed feasibility studies for a number of projects who intend HPP Constructions on Shala River, more specifically: Feasibility Studies for HPP Lekaj (18 MW) Feasibility Studies for HPP Lekaj (7.55 MW) Feasibility Studies for HPP Lekaj Vajvishti (57.9 MW) The total installed power specified by calculating the river flow is expected to […]
Read moreProject Title: Feasibility study for the Skavica HydroPower Plant on Drini i Zi River (200MW) Skavica is one of the most strategic Projects of Albania and it provides some major development advantages for the energy sector, agriculture as well as socio-economic life of the region influenced by it. For the energy sector, this Project will help […]
Read moreProject Title: Feasibility study for Poçemi HydroPower Plant on Vjosa River (99.5MW) Çinar – San Group is a company that is interested in renewable energy generation sources at Vjosa River by investing and constructing Poçem Hydroelectric power plant project. For this purpose GR ALBANIA have prepared the proposal and submitting for its consideration for further development […]
Read morePower = 14.9 MW Shushica Hydropower is a company which is interested in renewable energy generation sources at Shushica River by investing and constructing Shushica Cascade HEPPs project. In this context, GR ALBANIA has developed the proposal and submitted for its consideration for further development of Shushica Cascade Hydroelectric Power Plants project based in the […]
Read moreThe project “Costal storage facilities 2×10000 m3” is designed for the construction of two new storage tanks in Porto Romano, having as developer “ISC Petroleum Company” which is also the investor of the project. The purpose of this design will be the construction of two new tanks of 10000 m3 near oil treatment facility in […]
Read moreGR Albania Oil and Gas professionals work with clients to help maximize business potential across the full spectrum of the industry – from super majors and trading businesses to independents – to deliver services, perspectives and solutions that best suit the business and its people. For our client ZenTol & Burimi Xh, the company used […]
Read moreSan Leon Energy plc is dedicated to maximising value in energy exploration and production. They have a balanced portfolio of conventional and shale assets across Europe and North Africa. San Leon holds a 100% participating interest in the Durresi Block, offshore Albania. The licence area, which covers 4,200 square kilometers, contains the A4-1X gas/condensate discovery […]
Read moreThe company “AL – GAZ 2015” operates in the area of Porto Romano for the storage of natural gas, carrying out its activity on 2 hectars and with a capacity of 4 000 m3. “AL-GAZ 2015” aims to expand this activity, increasing the area of activity with 9992 m2 and the total area will reach […]
Read moreThe project for the bituminous sand processing plant includes the construction of the Bituminous Sand Processing Plant and the construction of a series of other extra facilities (silos) owned by “Recovered Earth Patos” company, which will be used for the processing of bituminous sands as foreseen by the patented technology of the company.
Read moreGR Albania Oil and Gas professionals work with clients to help maximize business potential across the full spectrum of the industry – from super majors and trading businesses to independents – to deliver services, perspectives and solutions that best suit the business and its people. For our client Albitumen Sha, the company used all its […]
Read moreBrema Ambiente and Gruppo MAIO proposed the construction of an industrial plant for the integrated management of scrap iron and metal and non-metal recovery, and production of raw materials to the final disposal and conversion into energy. The project has a total investment of 60 million euros and it is planned to extend its services […]
Read moreThe scope of the project is extending the oil field, collecting and cleaning hydrocarbon waste and waste from ships, construction of all facilities related to processing of the waste collected to benefit the economy, the construction of buildings within the legal framework for the processing of any oil, buying, leasing and rental of gas stations, […]
Read moreER OIL products terminal is specialized in the storage and handling of all petroleum products and biodiesel. The terminal is strategically located in Porto Romano near Durrës port for users along the Adriatic coast as well as for inland users. The majority of customers are active in the oil industry, for which ER OIL stores […]
Read moreStream Oil & Gas Ltd has requested the service for Drafting of an Integrated Intra-Sectorial Plan and its Approval in all the administrative institutions, concerning the licensed area for Hydrocarbon Production in Ballsh-Hekal, Cakran-Mollaj, Gorisht-Kocul, Delvina, Usoja and Company associate infrastructure in Albania. The administrative units included in this sectorial plan comprise and area […]
Read moreGR Albania Oil and Gas professionals work with clients to help maximize business potential across the full spectrum of the industry. We helped an international entity with their oil field project here in Albania with the following specifications: 28.6 km2, 4 layers to a depth of 800 to 1,900 metres.
Read moreGR Albania has supported one of the key players in the Oil & Gas Industry in Albania with his services in the development of: 80 oil wells leases 1 Central Treatment Facility 4 Production wells PAD 4 hydrocarbon waste treatment and disposal facility 195 Km of pipelines network 80 Km of Road Network planning and […]
Read more